ГлавнаяСборникиТурнирыРазделыФорумыУчастникиПечатьПомощьО системе

Турниры > IMPC - 2013-2014 > задача:


14-04-50. 50697 - Base Stations

IMPC - 2013-2014

Старт: 16.мар.2013 в 12:00:00
Финиш: 16.мар.2013 в 17:00:00
Турнир завершён!
• Турнирная таблица

Гость
• Вопросы к жюри (2)

Задачи турнира

• 14-03-60. 50382 - Parkside's Other ...
• 14-03-70. 50468 - Draw Matrix - 2
• 14-03-70. s
• 14-03-80. 50675 - Kruja Boys
• 14-03-90. 50717 - Hurdle Jumping
• 14-04-20. 50493 - n-digit kth Prime ...
• 14-04-30. 50669 - Area of an Irregu...
• 14-04-40. 50712 - Moon algebra
• 14-04-50. 50697 - Base Stations
• 14-05-10. 50723 - Tribonacci
• 14-05-20. 50677 - The Cottage
• 14-05-20. 50413 - Valid Permutations
• 14-05-30. 50688 - Epoka Furgon
• 14-05-30. 50706 - The most crowd...
• 14-05-40. 50689 - The biggest build...
• 14-05-50. 50414 - Traffic
• 14-05-50. 50421 - Repairing road s...

Обратная связь

Если у вас есть предложения или пожелания по работе Contester, посетите форум сайта www.contester.ru.

Лимит времени 2000/4000/4000/4000 мс. Лимит памяти 65000/65000/65000/65000 Кб.
Question by Osman Ay.

Base Stations

Question: A GSM Company has recently built new base stations to extend his coverage area. The fiber optic communication cables are used to connect any two base stations. The company hired you to be sure that all the base stations are connected each other directly or via some other base stations. The company has the list of the directly connected base stations. You should make a program that prints number of the additional connections needed to fulfill the company's demand.

Input specification
The first line of the input contains two integers N (1 ≤ N ≤ 1000) and M (1 ≤ M ≤ 100000). N is the number of the base stations and M is the number of the connections. The base stations are numbered from 1 to N. Each of the following M lines represents a unique connection with a pair of integer: x and y (1 ≤ x, y ≤ N) where, x and y denotes the station numbers. The stations are numbered from 1 to N.

Output specification
The output contains a single integer that is number of the additional connections. If all the base stations are already connected each other, print 0.

 Sample Input   
 7 8
 1 5
 1 4
 3 7
 2 4
 2 6
 2 5
 5 6
 1 6
 Sample Output   
 1


Для отправки решений необходимо выполнить вход.

www.contester.ru